The case, in the
structures we have shipped.
Five reference projects, each with the commercial and engineering outcomes on record. Full case-study documents (bill-of-materials, lifecycle model, post-pour review) are available on request.
A 21.3 km flood-control channel through a coastal city, exposed to salt water, sand and intense heat. After chloride-attack lifecycle modelling against steel rebar, GFRP was specified across the entire run. Documented by the American Concrete Institute, the project sets the scale benchmark for industrial-grade composite reinforcement.
Three more,
on record.
-
MIBACH · GERMANY 2023Airline hangar floor — 82 km on spoolsSlab reinforcement delivered on continuous coils. Half the rebar tonnage compared with steel, four times the installation speed, eighty-five percent less transport. The benchmark for our spool-delivery and installation-speed claims.
82 kmGFRP delivered~30 %of steel weight4×install speed85 %less transport -
BUILD BETTER · 2024 2024Selected by Microsoft, Capgemini & BouyguesComposite Group (via FROOT, our US partner) was selected from 75+ applicants in the Elemental Impact Build Better Innovation Challenge. Funded pilots and scaling support from the climate-validation cohort.
75+applicants6winners selected2024cohortClimatevalidated
Every project on this page carries documentation we can send. None of these numbers are promotional; they are extracted from the bill-of-materials and the post-pour review.